Home › Cost Bitcoin Mining

GT 430 bitcoin mining

Mining Calculator - BitClockers Bitcoin Mining Pool  October 23, 2013 – 12:13

Bitcoin Mining Calculator

NOTE: The BTC per block award dropped from 50 to 25 BTC per block November 28th, 2012. (source)

The current mining difficulty is 267, 731, 249. The next difficulty is estimated to change by 41.46% to 378, 745, 370 on block #266, 111. That should be 2 days 18 hours 58 mins 48 seconds from now.

The network has mined 265, 501 blocks. This has generated 11, 887, 525 BTC with an average value of $203.57 USD each. Worldwide BTC circulation is valued at $2, 419, 947, 506.01 USD.

The pool has mined 913 blocks with a current value of $4, 646, 485.25 USD.

If you earn 25.00 BTC per block found with a value of $203.57 per BTC, mining with a difficulty of 267731249 at 1200 Mh/s, power costing $0.12 per kilowatt hour @ 750 watts for the next 90 days, spending $1100 in startup costs:

24 hours 1 month 1 year 90 days
Est difficulty: 267, 731, 249 273, 085, 874 339, 547, 960 283, 887, 420
BTC earned: 0.00225412 0.06762345 0.73785390 0.19878849
Revenue: $ 0.46 $ 13.77 $ 150.20 $ 40.47
Power cost: $ 2.16 $ 64.80 $ 788.40 $ 194.40
Net revenue: $ -1.70 $ -51.03 $ -638.20 $ -153.93

Bitcoins per day: 0.00225412 BTC

Generate a block every:

Source: bitclockers.com

Related posts:

  1. GTX 690 Bitcoin mining
  2. WTF is Bitcoin Mining
  3. Bitcoin mining BG
  4. Fedora Bitcoin mining
  5. AMD FX Bitcoin mining